Implementation guidelines.
The installation of EUROPIR® TUBE plugs involves cutting a hole approximately 15–20 mm deep (depending on the shape of the mechanical connector plate) in the insulation board using a special attachment for a drill.
Then, install the mechanical connector according to the supplier's or manufacturer's instructions.
After fixing the connector, insert the tube into the hole made at the mounting point of the fastening connector, press it in until you feel clear resistance and cut off the remaining protruding part with a knife or hand saw so that it is flush with the façade.
If necessary, simply sand the resulting plug with the remaining part of the tube or a polyurethane cube.